The basic thinking around a Waterfall project is to have a checklist of things needed to be handled before each gate (step in the process).

 

The steering committee controles that the checklist is performed and approves deviations to the checklist if needed.

 

Development is performed simultaneously to all functions and parts of the project.

 

The activities in the checklist can be very detailed meaning that this way of steering is quite detailed

project%204_edited.jpg

A project is a temporary effort undertaken to create a unique product, service or result

 

A lot of changes are performed in projects

 

You assign cross-functional project groups to steer and perform the project

To have a common picture of the progress of a project is essential in a company and there are a couple of advantages that I mention

Everyone in the company should know how far the project has progressed   (What checkpoint is passed and when the next one will be passed)

Updates from previous projects can be used in all new projects

In the document the following areas are covered:
-  Project the Dyne way (I am using the Set-based pinciples described among
    The Building Blocks)
-  Project the design process way
-  To consider when using set-based engineering
-  Checkpoints

-  Steering group/Sponsor support

Project%2027_edited.jpg

Agree and decide on chosen model

 

Make it detailed enough, make it easy to follow

To pass a predefined checkpoint (decision between the Project and the Steering group/Sponsor)

  • Everything is fulfilled up to the checkpoint – if not fulfilled there needs to be a timeplan on how the Project can catch up (does the project need extra resources or help in any other way from the steering group?

  • What needs to be fullfilled up to the next checkpoint? (based on the process description and the delayed activities from this checkpoint).

Things to be aware of when you use Watherhall modells

The Waterfall model is an ideal model so when you run a project acording to it it will never work without exeptions and diviations.

 

Running a project is activly deling with risks (e.g. the risk that a solution do not work as entended).

 

So the chalings for the project leader is to manage the risks and keep them under controll.

 

The Setbased technique described i Building blocks is a way to mitigate risks of failiers learning to know before desiding.  

Presentation of Project. The corresponding PPP is for sale. 

Reference

Design Process written by  Rikke Friis Dam och Teo Yu Siang 

By material

Menues

Hart and Mind 1png_edited.jpg
Logga%2520H%25C3%25B6ger_html_9c30614065d52f76_edited_edited.png

Main Menu

Building Block Menu

Training%20loggo_edited.jpg

Training Menu

cochning_edited.jpg
Logo%20assesmentt_edited.jpg

Assessment Menu

Coaching Menu

Company Phisosophy_edited.jpg

Company Philosophy Menu

Workshop_edited.jpg

Workshop Menu

A Human Centered Organisation

Core Human Values

Spotlight.png

SPOTLIGHT on Heart and Mind menu

  • Facebook
Linkedin3.png

Anders Dyne living in: Västra Götaland län SWEDEN
Askims Stenblocksväg 2 b 43640 Askim Tele: 0046765174174

bottom of page